June 4, 2026

100% ID Checks at All Pax River Gates

ID Checks

NAS Patuxent River began conducting 100% ID checks at all of its gates at 4pm Friday, June 13, 2025, until further notice.

Sidewalk Construction Update at Pax

Naval Air Station Patuxent River has announced that sidewalk construction outside of Pax River gates 1 and 2 has begun and will conclude on April 7, 2023.